Village Staff and other Contractors working for the Village have begun activities for the design and inspections of the 2027 Road Program project. Diggers hotline markings will occur throughout the subdivisions. Please do not remove utility flags placed. It’s important to know where existing utilities are located for design, mapping, and drilling purposes. Giles Engineering has started the geotechnical drilling operations within strategic locations throughout the subdivisions (typically located within the pavement areas - see link below showing proposed borings). Green Bay Pipe & TV will start televising the existing sanitary and storm sewer systems in May. Village Staff will perform pavement markings of repairs for the sidewalks, curbs, and roadways throughout the Spring/Summer. Village Staff will inspect the valves, hydrants, sanitary and storm sewer structures throughout the Spring/Summer. After various areas are marked for repairs, the design Consultant will flyover their drone equipment to collect data for mapping the proposed repairs. Construction is planned for late March/early April 2027.
Geotechnical RFP Maps - Proposed Soil Borings - 2027 Road Program